This site is a bathroom in an apartment block, which was necessary to be done waterproofing. Before we begin waterproofing in the bathroom were made some preliminary revisions and changes as passing additional plumbing to change the location of the sink and the shower. As a result of these changes that have been made part of the bathroom is lined with plasterboard, as evidenced by the photos.
Our team undertook a hydro bath with liquid rubber Hydroflex-Universal/ white / and laying of reinforced insulation polyester canvas A-65 to further increase the elasticity.
Once the liquid rubber waterproofing is complete bathroom is ready for the next stage - laying tiles!